124. If a pipeline construction or use authorization is awarded on private land or land leased by the State, the authorization holder must, within 30 days after registering the authorization in the public register of real and immovable rights related to natural gas storage and natural gas and oil pipelines and in the manner the Government determines by regulation, notify the owner or lessee, the local municipality and the regional county municipality, in writing, of the authorization obtained.
2016, c. 35, s. 232016, c. 35, s. 23; 2022, c. 102022, c. 10, s. 591.